Welcome to Shandong HaoXuan Iron&Steel Co.,Ltd.
WhatsApp :+8619538022517 Email : sales@hxsteelcn.com
Preparation method of carbon steel pipe
Release time:
2022-09-16
The raw material of carbon steel pipe is round tube blank, which needs to be cut and processed by a cutting machine to form a billet with a length of about 1 meter, and then sent to the furnace for heating through a conveyor belt. The billet is fed into the furnace for heating, with a temperature of approximately 1200 degrees Celsius.
The raw material of carbon steel pipe is round tube blank, which needs to be cut and processed by a cutting machine to form a billet with a length of about 1 meter, and then sent to the furnace for heating through a conveyor belt. The billet is fed into the furnace for heating, with a temperature of approximately 1200 degrees Celsius. The fuel is hydrogen or acetylene. Temperature control in the furnace is a crucial issue. After the round tube billet is discharged from the furnace, it needs to be pierced through by a pressure piercing machine. The commonly used piercing machine is a conical roller piercing machine, which has high production efficiency, good product quality, large perforation and expansion capacity, and can pierce various steel grades. After perforation, the round tube blank is sequentially rolled, continuously rolled, or extruded by three rollers. After squeezing, the pipe needs to be detached and sized. The sizing machine uses a conical drill bit to rotate at high speed into the steel billet for drilling, forming a steel pipe. The inner diameter of the steel pipe is determined by the outer diameter length of the sizing machine drill bit. After the steel pipe is sized, it enters the cooling tower and is cooled by water spray. After cooling, the steel pipe needs to be straightened. After straightening, the steel pipe is transported by a conveyor belt to a metal inspection machine (or hydraulic test) for internal inspection. If there are cracks, bubbles, and other issues inside the steel pipe, they will be detected. After the quality inspection of steel pipes, strict manual selection is also required. After the quality inspection of the steel pipe, the number, specification, production batch number, etc. are sprayed with paint. And lifted into the warehouse by a crane.
LATEST NEWS
Shandong Haoxuan met with Turkish customers
The occasion marked a significant milestone in our business relations as they expressed a keen interest in our seamless cold-rolled steel products.
2024-05-14
Signed strategic cooperation with Laigang for DH36 Marine section steel
Shandong Haoxuan Steel Co., Ltd. has proudly announced the signing of a strategic cooperation agreement with Laiwu Iron and Steel Group (Laigang) for the supply of 1,200 tons of DH36 marine steel, destined for a prestigious Japanese client.
2024-05-06
Hao Xuan met with Vietnamese Hai Phong
t not only strengthened the existing business relationship but also laid a solid foundation for deeper collaboration in the future. Both sides looked forward to exploring new opportunities together and driving mutual growth and success.
2024-04-16
Haoxuan met with posco business representatives in Vietnam
On April 8th, 2024, our company's business representative, Ms. Vela Ding, traveled to the Dong Nai Province of Vietnam to meet with Ms. Vo Thi Phuong Tuyen, a client from POSCO Enterprises.
2024-04-15
Haoxuan appeared at cippe2024 International Petroleum Exhibition
The participating team of Shandong Haoxuan Shidi Iron and Steel Co., Ltd. has gained a lot in this exhibition, not only seeing many cutting-edge technologies, but also expanding the business cooperation network.
2024-04-01
What is the difference between carbon steel and stainless steel
The density of carbon steel is slightly higher than that of ferritic and martensitic stainless steel, but it is lower for austenitic stainless steel, so the difference between carbon steel and stainless steel is different.
2022-09-16